Week 6: 10/06/2011
Week 6: 10/06/2011
With the floors cut, the next step was to prepare for the puring of concrete on the ground under the 1st floor and touch-up work above.
« previous | next »
Inside the temporary buffer wall from the back (west) door.
Inside the temporary buffer wall from the back (west) door.