Week 15: 12/8/2011
Week 15: 12/8/2011
 
 
 
 
 
 
 
The parts to the elavator cab and the mechanisms to make it go up and down are installed.
« previous | next »
 
 
The working elevator is used to hoist parts to the 2nd and 3rd floors.