Week 13: 11/23/2011
Week 13: 11/23/2011
 
 
 
 
 
After a week of inactivity, the concrete was poured for the base of the elevator shaft and the mechanical room and steel beam supports were installed around the shaft at each floor.
« previous | next »
 
 
The final concrete base floor was poured.